HOW AN SZ STRANDING LINE IMPROVES CABLE PRODUCTION

Intermittent Bonded Ribbon Production Line Available For Sale

A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.

Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. The published product information covers capabilities, technical details, and supplied systems, helping U.S. buyers begin evaluating the equipment against their manufacturing needs.

Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. Doing so can clarify which specifications and options are relevant to your facility and production objectives.

Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Consider the product listing a preliminary information source, and confirm up-to-date specifications and commercial terms with the supplier. A detailed quotation request can help advance your equipment evaluation.




Important Points To Consider

  • The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
  • This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
  • Information about equipment functions, specifications, and included systems appears on the product page.
  • Request details about pricing, installation requirements, and project-specific customization.
  • A company address in Shanghai’s Songjiang District is included in the supplier information.

Intermittent Bonded Ribbon Production Line Overview

According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons

The machine configuration accommodates two different fiber counts in rollable ribbon designs. Buyers can use these options as a starting point for checking compatibility with target formats, fiber sizes, and handling requirements.

How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations

According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.

By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. These bond-spacing figures describe examples of the design approach and should not be interpreted as stated equipment settings.

  • Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Adaptable handling when the ribbon takes different shapes.

Uses In Optical Fiber Cable Manufacturing

Flexible ribbon arrangements can help cable designers balance access for splicing with compact cable packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.

High Fiber Density And Compact Cable Designs

For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. The patent identifies opportunities for reduced cable dimensions and a greater proportion of fiber area relative to the cable’s cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.

Organizing Fiber Ribbons To Support Efficient Fusion Splicing

The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.

Design characteristic Possible application Consideration for buyers
Flat fiber configuration Mass fusion splicing Confirm requirements for the splice workflow
Folded or rolled format Space-efficient cable packaging Review the overall cable construction
Payoff reels with capacities of 25.2 km and 50.4 km Material-handling preparation Align reel capacities with operating needs

Production Line Specifications And Performance

Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Reel compatibility and facility utility requirements are also important considerations for installation planning.

Production Speed, Fiber Diameter, And Attenuation

According to the specifications, the construction speed reaches 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.

Compatibility With Payoff And Take-Up Reels

The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.

Facility Utilities And Operating Environment

Plan for a 380 V ±10% power connection using a three-phase, five-wire system. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Verify the required utility connections before installation begins.

Specification Published requirement Planning note
Payoff reels Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Check reel compatibility and maximum weight
Reel used for take-up T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel Verify the preferred reel format
Electrical and environmental requirements 380 V ±10%; 15 to 25°C; relative humidity ≤85% Prepare a dry, clean, draft-free operating area
Gas utility supply Nitrogen: 7 bar, 99.99% purity; air: 6 bar Verify gas supply capacity before installation

Equipment For Fiber Payoff And Gathering

The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. Their control systems support consistent feeding and help protect individual fibers throughout handling.

Tension-Controlled Payoff System For Sixteen Spools

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.

Fiber Guiding, Break Detection, And Electrostatic Control

The forming area receives fibers through U-groove guides, multi-groove gathering rollers, and devices designed to prevent jumping. Operators receive alerts about fiber problems through break detection and alarm functions. Protective guards and pneumatic clamping provide additional support for safe material handling. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.

Equipment component Specified details Purpose
Payoff Capacity for 16 spools, each weighing up to 10 kg Feeds optical fibers with traversing movement
Motor and tension system Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W Maintains controlled fiber payoff
Fiber guidance and safety features Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp Directs fibers and supports safe handling
Electrostatic management Rod-style electrostatic collector with anti-static devices Helps reduce dust near fiber routes

Precision Molding And Intermittent Adhesive Dispensing

The ribbon-forming platform allows operators to control the mold position and placement of adhesive. Available adjustments help configure the process for each required ribbon format.

Ribbon Formation Using An Adjustable IBR Mold Platform

Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production

The 12-fiber configuration employs a 5+5+1 valve arrangement. The 16-fiber format is produced using a 5+5+5 valve layout. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. The process calls for a specialized adhesive suitable for both coating and curing.

Process setting Format With 12 Fibers Format With 16 Fibers
Valve arrangement Valve arrangement of 5+5+1 5+5+5 valve configuration
Mold positioning range Adjustment range of 0 to 15 mm Adjustment range of 0 to 15 mm
Temperature of the mold base 20°C to 60°C operating range 20°C to 60°C operating range

UV-LED Curing For Bonded Fiber Ribbons

Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. The arrangement of the ovens and their published operating values provide buyers with information for evaluating process compatibility.

Pre-Curing And Main Curing Stages

Pre-curing is handled by three specialized 800 W LED-UV ovens. Fibers from each mold group pass through their respective pre-curing unit before entering the principal 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.

Managing Nitrogen Supply And Curing Performance

The nitrogen flow rate and pressure can be adjusted by hand. The system additionally switches nitrogen on when starting and off when shutting down. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Ask whether different adhesives or materials require adjustments to the settings.

Visual Inspection, Capstan Traction, And Take-Up

As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.

Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement

Real-time magnified views are displayed through the machine’s microscope and camera system. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. This inspection helps identify ribbon problems before the material enters the winding stage.

Precision Take-Up With Servo-Controlled Traction

The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.

Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. The cable pitch setting allows continuous adjustment from 1 to 6 mm. A photoelectric sensor monitors position and assists with reversing direction. Confirm that the operating conditions and settings are suitable for your target cable design with the supplier.

Electrical Controls And Production Monitoring

Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.

Operating The Production Line Through PLC And Touchscreen Controls

Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Low-voltage switchgear is supplied by Schneider Electric. The system supports both interlocked operation across the full production line and separate operation of individual units.

Process Settings, Warning Alarms, And Preset-Length Shutdowns

Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. Additional displays provide lamp runtime, real-time current readings, curing-oven temperature, and total machine operating hours. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.

A preset length can be entered to initiate slowing or stopping of the machine. This provides a practical way to control the end of a cable production run. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.

Control-system feature Listed detail Use
PLC controls and operator display Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen Configure settings and examine production data
Electrical components Low-voltage switchgear from Schneider Electric Provides support for system control
Monitoring and stopping Operating data for lamps, ovens, runtime, and meters; preset-length function Monitor production and stop or decelerate the equipment

Ribbon Quality, Material Selection, And Process Compatibility

The selected adhesive influences coating uniformity and the quality of the finished ribbon. The manufacturer calls for a specialized adhesive intended for the machine’s coating and curing process instead of an ordinary multipurpose product.

Dedicated Adhesive For Bonding And Curing

Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.

The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. Preventing unintended exposure matters because adhesive behavior could be affected before the material reaches the fiber surface.

Before selecting materials for a secondary coating line, verify adhesive compatibility, production settings, and required surface-quality standards with the supplier. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Clear process instructions can help maintain quality from initial setup through final production.

Equipment Installation Needs And Supplied Documentation

Prepare the installation area and necessary utility connections before arranging equipment setup. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Required Facility Conditions And Connections Provided By The Buyer

The machine should be positioned inside a draft-free, enclosed workspace that is clean and dry. Keep the operating area between 15 and 25°C, with humidity at or below 85%. Provide nitrogen at 7 bar and 99.99% purity, along with compressed air at 6 bar.

Connection cables and cable trays are excluded from the supplied equipment. The purchaser is responsible for supplying the main incoming power cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.

Operating Manuals, Drawings, And Maintenance Information

The supplier includes documentation supporting machine installation, operation, and servicing. Review these records before startup to help staff plan work activities and identify necessary supplies.

  • Operating and instruction manuals together with the overall equipment layout drawing
  • Wiring and electrical schematic diagrams, plus installation and maintenance drawings
  • Manuals for purchased parts and a list of wear parts for maintenance planning

The supplied records support preparation for commissioning and routine servicing of the cable production machinery.

Choosing A Ribbon Production Line For Your Manufacturing Needs

Begin by identifying the ribbon formats you intend to manufacture and sell. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.

Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Confirm that the listed reel dimensions, capacity, and pitch range are appropriate for your site and handling process.

Payoff reel compatibility also deserves attention. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.

Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. Assess whether the equipment arrangement is appropriate for fiber cable, loose tube, or the specific application in your cable production process. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. A thorough compatibility assessment can help prevent expensive modifications later.

Production planning consideration Listed detail Required buyer verification
Formats and speed 12F and 16F formats; 600 m/min Match the specifications to manufacturing goals and product range
Take-up configuration Maximum 30 kg; cable pitch of 1 to 6 mm Check reel compatibility and facility requirements
Payoff spools Capacities of 25.2 km, 50.4 km, and 63 km Confirm the precise reel measurements

How To Request A Quotation For The Intermittent Bonded Ribbon Production Line

U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Compare these features with your planned cable products to assess equipment suitability.

A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.

Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.

Use the manufacturer’s product listing to examine the equipment information. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. Providing complete information in your quote request makes the following stages easier to clarify.